

In the construction work on the soft ground, we engineer will encounter ground troubles which were not estimated at the beginning at first. In order to fix these troubles quickly, the engineer must be required the well trained technical skills. To determine the cause, we will make efficient use of the similar observation data, soil investigation and numerical analysis. As a consequence we will propose optimized countermeasure.

Construction situation of mixing

Stabilized column body beside box culvert


Steel pipe sheet pile foundation

Reinforced earth retaining wall on soft ground

Reinforced bottom of shallow soil stabilization

Countermeasure for slope stability

